This flythrough was prepared in 2009 to give an impression of what the finished project might be like. Since then the scheme has been amended in a number of ways, most notably by the expansion of the annexe basement. This is not shown on the flythrough. One thing that is shown prominently on the flythrough however has been removed from the present scheme. There is now no intention of building the balcony resource area in the atrium link building.
